SBI ASSO PO Questions and answers

  1. Exams
    1. TNPSC
    2. Bank Exams
      1. RBI Grade B
      2. IBPS PO-Main Exam
      3. IBPS PO-Prelims
      4. IBPS Clerk-Prelims
      5. IBPS SO IT
      6. SBI ASSO PO
      7. IBPS Clerk
      8. LIC AAO
      9. SBI Associates Clerk
      10. IBPS PO-Prelims1
      11. IBPS PO-Prelims2
      12. IBPS clerk-Prelims2
      13. SBI JuniorAssociate
      14. Bank Of Baroda-Probationary officer
      15. NABARD Assistant Manager-Preliminary Examination
      16. IBPS RRB-Preliminary Exam
      17. IBPS Clerk-Preliminary Exam
      18. IBPS PO-Prelims3
      19. IBPS Clerk1
      20. IBPS PO-Prelims4
      21. IBPS Clerk2
      22. SBI JuniorAssociates-Prelims
      23. IBPS RRB-Prelims
      24. SBI JuniorAssociate-1
      25. SBI JuniorAssociate-2
      26. IBPS RRB-Prelims
      27. SBI PO-Prelims
      28. SBI JuniorAssociate-3
      29. SBI JuniorAssociate-4
      30. SBI JuniorAssociate-5
      31. SBI JuniorAssociate-6
      32. SBI PO-Main Exam
      33. SBI JuniorAssociate-7
      34. SBI JuniorAssociate-8
      35. SBI PO-Prelims2
      36. SBI PO-Prel

      Directions (Q. 121-126): Study the following information carefully to answer the given questions. 
      As part of renovation of an office, flooring, painting and carpeting of a hall is to be undertaken. The hall has length 16m, breadth 12m and height 5m. The cost of fiooring is Rs.2250 per \( m^{2}\) , that of painting is Rs.750 per sq m and that of carpeting is Rs.850 per sq m. 

      121). What will be the cost of carpeting the hall leaving aside the area of 1.8 m x 1.5 m for the wooden cabinet?
      A). Rs.164280
      B). Rs.162660
      C). Rs.160905
      D). Rs.162280
      E). Rs.l66645
      122). What will be the total cost of flooring the hall and painting the ceiling?
      A). Rs.560000
      B). Rs.576000
      C). Rs.524000
      D). Rs.580000
      E). Rs.564000
      123). What will be the cost of painting the four walls of the hall if it has a door of 1.6m x 2.5 m and a window of 10.8m X 1.5m?
      A). Rs.l90900
      B). Rs.208000
      C). Rs.l96800
      D). Rs.l98600
      E). Rs.206100
      124). What will be the cost of flooring the hall if the contractor offered 12% discount on the total cost?
      A). Rs.380160
      B). Rs.336440
      C). Rs.328240
      D). Rs.342320
      E). Rs.360350
      125). While painting the hall it was noticed that one wall on length side having no door or window required plastering which will cost Rs.320 per m2. What will be the cost of plastering and painting that particular wall?
      A). Rs.85600
      B). Rs.84400
      C). Rs.82800
      D). Rs.86400
      E). Rs.85200


      126). What will be the difference between the cost of painting the wall on length side and the wall on breadth side provided neither of the walls has a door or a window?
      A). Rs.14000
      B). Rs.15000
      C). Rs.15600
      D). Rs.l6000
      E). Rs.14500

      Directions (Q. 127-132): Study the following pie charts and the information given below them carefully and answer the given questions. 
      Percentage of six levels of employees in organisation I. 

      Total number of employees in the organisation is 20400
      Percentage of six levels of employees in organisation II. 

      Total number of employees in the organisation is 24800

      127). The total number of which level employee in both the organisations together is the maximum?
      A). A
      B). F
      C). C
      D). E
      E). D
      128). The difference between the number of employees in the two organisations of which level is the maximum?
      A). A
      B). D
      C). E
      D). F
      E). C
      129). The difference between the number of employees in the two organisations of which level is the maximum?
      A). A
      B). D
      C). E
      D). F
      E). C
      130). The number of B level employees in organisation 1 is less than that in organisation 11 by approximately what per cent?
      A). 60
      B). 55
      C). 50
      D). 40
      E). 45
      Go to :
      Total Pages : 20