In a mixture of 60 litres, the ratio of milk and water is 2 : 1. If this ratio is to be 1 :2, then what is the quantity of water to be further added?


A) 20 l

B) 30 l

C) 50 l

D) 60 l

Correct Answer:
D) 60 l

Description for Correct answer:

2+1=60l

60litre  = 40 +20

Ratio => 2 : 1

Required ratio => 1 :2

Now, The quantity of milk = 40 l=> 1 share

1 share = 40 l

2 shares = 80 1

Already 20 l water is in the mixture

The quantity of water to be further added =80-20=60l


Part of solved TNPSC Question Paper-2015 questions and answers : Exams >> TNPSC >> TNPSC Question Paper-2015








Comments

No comments available




Similar Questions
1). Two numbers are in the ratio of 3 : 5. If 9 be subtracted from each, then they are in the ratio of 12 : 23. Find the second number.
A). 52
B). 53
C). 54
D). 55
-- View Answer
2).

Sum of squares of three positive numbers is 608 and they are in the ratio 2 : 3 : 5. Then, find the numbers.

A). 6, 9,15
B). 8, 12, 20
C). 10, 15,25
D). 14, 21, 35
-- View Answer
3). If 30% of A = 0.25 of B = 1/5 of C, then find the ratio of A:B:C
A). 15 : 12 : 10
B). 12 : 15 : 10
C). 10 : 12 : 15
D). 10 : 15 : 12
-- View Answer
4). What is the third proportional to 0.34 and 0.50?
A). 0.74
B). 0.75
C). 0.76
D). 0.77
-- View Answer
5). In a cylinder, if radius is doubled and height is halved then what happens to the curved surface area?
A). Halved
B). Doubled
C). Does not change
D). Four times
-- View Answer


6). The length of side of a rhombus is 5m and one of its diagonal is 8 m. Then what is the length of other diagonal?
A). 5 m
B). 7 m
C). 6 m
D). 8 m
-- View Answer
7).

A, B and C can complete a piece ofwork in 24, 6 and 12 days respectively. If they work together, in how many days they will complete the same work?

A). 1/24 days
B). 7/24 days
C). 24/7 days
D). 24/11 days
-- View Answer
8). 12 men complete the 2400 sq.m ploughing work in 10 days. How many men are required to complete 3600 sq.m ploughing work in 18 days?
A). 10 men
B). 15 men
C). 18 men
D). 20 men
-- View Answer
9). 2 men and 7 boys can do a piece of work in 14 days, 3 men and 8 boys can do the same in 11 days. In how many days, 3 times the work can be completed by 8 men and 6 boys?
A). 21 days
B). 18 days
C). 24 days
D). 36 days
-- View Answer
10). The length, breadth and height of a hall are 8 m, 10m, 4m respectively and the hall has one door of area 3 m x 1.5m. Find the cost of painting the walls at the rate of Rs.200 per square metre.
A). Rs. 28,800
B). Rs. 59,900
C). Rs. 27,900
D). Rs. 60,800
-- View Answer