A tree is 12 m tall and casts an 8 m long shadow. At the same time, a flag pole casts a 100 m long shadow. How long is the flag pole?


A) 150 m

B) 200 m

C) 125 m

D) 115 m

Correct Answer:
A) 150 m

Description for Correct answer:
Because, 8 m shadow means original height = 12 m.

Therefore, 1 m shadow means original height = \( \Large \frac{12}{8} \) m

Therefore, 100 m shadow means original height

= \( \Large \frac{12}{8} \) *100m = \( \Large \frac{6}{4} \times 100 \)

= \( \Large 6 \times 25 \) = 150 m

Part of solved Unitary Method questions and answers : >> Aptitude >> Unitary Method








Comments

No comments available




Similar Questions
1). If 12 persons working 16 h per day earn Rs.33600 per week, then how much will 18 persons earn working 12 h per day?
A). Rs.40000
B). Rs.35000
C). Rs.28800
D). Rs.37800
-- View Answer
2). A man and a boy working together can complete a work in 24 days. If for the last 6 days, the man alone does the work, then it is completed in 26 days. How long will the boy take to complete the work alone?
A). 72 days
B). 73 days
C). 49 days
D). 62 days
-- View Answer
3). 25 men can reap a field in 20 days. When should 15 men leave the work, if the whole field is to be reaped in \( \Large 37\frac{1}{2} \) days after they leave the work?
A). After 5 days
B). After 10 days
C). After 9 days
D). After 7 days
-- View Answer
4). If 12 engines consume 30 metric tonnes of coal when each is running 18h per day, how much coal will be required for 16 engines, each running 24 h per day, it being given that 6 engines of former type consume as much as 8 engines of latter type?
A). 10 tonnes
B). 5 tonnes
C). 25 tonnes
D). 40 tonnes
-- View Answer
5). 8 men can complete a work in 12 days, 4 women can complete it in 48 days and 10 children can complete the same work in 24 days. In how many days can 10 men, 4 women and 10 children complete the same work?
A). 10 days
B). 5 days
C). 7 days
D). 6 days
-- View Answer


6). 20 men complete one-third of a work in 20 days. How many more men should be employed to finish the rest of the work in 25 more days?
A). 10
B). 12
C). 15
D). 20
-- View Answer
7). 40 men complete one-third of a work in 40 days. How many more men should be employed to finish the rest of the work in 50 more days?
A). 12
B). 20
C). 18
D). 24
-- View Answer
8). If a pipe fills a tank in 6 h, then what part of the tank will the pipe fill in 1 h?
A). \( \Large \frac{1}{3} \)
B). \( \Large \frac{1}{6} \)
C). \( \Large \frac{1}{4} \)
D). \( \Large \frac{1}{5} \)
-- View Answer
9). An outlet pipe can empty a cistern in 30 min, then what part of the cistern will it empty in 1 min?
A). \( \Large \frac{1}{20} \)
B). \( \Large \frac{1}{15} \)
C). \( \Large \frac{1}{30} \)
D). \( \Large \frac{1}{18} \)
-- View Answer
10). An inlet pipe fills \( \Large \Large \frac{1}{8} \) part of a tank in 1 h. How much time will the pipe take to fill the empty tank?
A). 4h
B). 2h
C). 6h
D). 8h
-- View Answer