Time and work Questions and answers

  1. Aptitude
    1. Compound interest
    2. Boat and Stream
    3. Trains
    4. Percentage
    5. Discount
    6. Mixture and Allegation
    7. Unitary Method
    8. Work and Wages
    9. Pipes and Cisterns
    10. Linear Equations
    11. Approximation
    12. Word problems
    13. Number System
    14. Time and Distance
    15. Average
    16. Ratio and Proportions
    17. Profit and Loss
    18. Partnership
    19. Permutation and combination
    20. Probability
    21. Problem on ages
    22. Time and work
    23. Simple and compound interest
    24. Mensuration
    25. Number series
61). Rambabu, Santosh and Sunil can finish a piece of work in 10, 12 and 15 days respectively. If Santosh stops doing the work after 2 days, Rambabu and Sunil will finish the work in
A). 2 days
B). 3 days
C). \( \Large 2\frac{1}{2} \) days
D). \( \Large 3\frac{1}{2} \) days
62). Three taps A, B and C can fill a tank in 12, 15 and 20 hours respectively. If A is open all the time and B and C are opened for one hour each alternatively, and A and B initiate, then tank will an in
A). \( \Large 7\frac{3}{4} \) hours
B). 8 hours
C). 7 hours
D). \( \Large 7\frac{1}{2} \) hours
63). A man undertakes to do a certain work in 150 days. He employs 200 workers. He discovers that only a quarter of the work is done is 50 days. In order to complete the work on schedule, he must additionally employ
A). 50 workers
B). 100 workers
C). 150 workers
D). 200 workers
64). An electric pump can fill a tank in 3 hours. Because of a leak in the tank, it took \( \Large 3\frac{1}{2} \) hours to fill the tank. The leak can drain out all the water of the tank in
A). 21 hours
B). 24 hours
C). \( \Large 10\frac{1}{2} \) hours
D). 12 hours
65). Rajan can do a piece of work in 30 days and Mukesh in 20 days. Mukesh alone do it for 10 days and then leaves. Raj an alone can finish the remaining work in
A). 15 days
B). 12 days
C). 14 days
D). 18 days


66). A group of 10 students working one hour per day complete a piece of work in 12 days. If there are 12 students in the group and they work one hour per day, then will be able to complete the work in
A). 8 days
B). 9 days
C). 10 days
D). 11 days
67). Ram and Sunil can finish a work in 8 and 16 hours respectively. If they work at it alternatively for an hour Ram beginning first, the work will be finish in.
A). \( \Large 8\frac{3}{4} \) hours
B). \( \Large 10\frac{2}{3} \) hours
C). \( \Large 10\frac{1}{2} \) hours
D). \( \Large 11\frac{2}{3} \) hours
68). 12 men complete a work in 18 days. 6 days after they had started working, 4 men joined them. How many days will all of them take to complete the remaining work?
A). 8 days
B). 12 days
C). 13 days
D). 9 days
69). 72 men can build a wall 280 m long in 42 days. The number of persons who would take 36 days to build a similar will 100 m in length will be
A). 15
B). 30
C). 25
D). 20
70). Sunil can do a work in 36 days, Ram in 54 days and Balu in 72 days. They started working together but before the work was to be over, Sunil left 8 days before and 12 days before Ram. Balu will complete the work alone in
A). 20 days
B). 24 days
C). 30 days
D). 34 days
Go to :
Total Pages : 51