61). Rambabu, Santosh and Sunil can finish a piece of work in 10, 12 and 15 days respectively. If Santosh stops doing the work after 2 days, Rambabu and Sunil will finish the work in
A). 2 days |
B). 3 days |
C). \( \Large 2\frac{1}{2} \) days |
D). \( \Large 3\frac{1}{2} \) days |
|
62). Three taps A, B and C can fill a tank in 12, 15 and 20 hours respectively. If A is open all the time and B and C are opened for one hour each alternatively, and A and B initiate, then tank will an in
A). \( \Large 7\frac{3}{4} \) hours |
B). 8 hours |
C). 7 hours |
D). \( \Large 7\frac{1}{2} \) hours |
|
63). A man undertakes to do a certain work in 150 days. He employs 200 workers. He discovers that only a quarter of the work is done is 50 days. In order to complete the work on schedule, he must additionally employ
A). 50 workers |
B). 100 workers |
C). 150 workers |
D). 200 workers |
|
64). An electric pump can fill a tank in 3 hours. Because of a leak in the tank, it took \( \Large 3\frac{1}{2} \) hours to fill the tank. The leak can drain out all the water of the tank in
A). 21 hours |
B). 24 hours |
C). \( \Large 10\frac{1}{2} \) hours |
D). 12 hours |
|
65). Rajan can do a piece of work in 30 days and Mukesh in 20 days. Mukesh alone do it for 10 days and then leaves. Raj an alone can finish the remaining work in
A). 15 days |
B). 12 days |
C). 14 days |
D). 18 days |
|
66). A group of 10 students working one hour per day complete a piece of work in 12 days. If there are 12 students in the group and they work one hour per day, then will be able to complete the work in
A). 8 days |
B). 9 days |
C). 10 days |
D). 11 days |
|
67). Ram and Sunil can finish a work in 8 and 16 hours respectively. If they work at it alternatively for an hour Ram beginning first, the work will be finish in.
A). \( \Large 8\frac{3}{4} \) hours |
B). \( \Large 10\frac{2}{3} \) hours |
C). \( \Large 10\frac{1}{2} \) hours |
D). \( \Large 11\frac{2}{3} \) hours |
|
68). 12 men complete a work in 18 days. 6 days after they had started working, 4 men joined them. How many days will all of them take to complete the remaining work?
A). 8 days |
B). 12 days |
C). 13 days |
D). 9 days |
|
69). 72 men can build a wall 280 m long in 42 days. The number of persons who would take 36 days to build a similar will 100 m in length will be
A). 15 |
B). 30 |
C). 25 |
D). 20 |
|
70). Sunil can do a work in 36 days, Ram in 54 days and Balu in 72 days. They started working together but before the work was to be over, Sunil left 8 days before and 12 days before Ram. Balu will complete the work alone in
A). 20 days |
B). 24 days |
C). 30 days |
D). 34 days |
|